{"id":861742,"date":"2026-01-23T11:28:00","date_gmt":"2026-01-23T19:28:00","guid":{"rendered":"https:\/\/www.heraldnet.com\/news\/sound-transit-to-open-complete-2-line-in-march\/"},"modified":"2026-01-23T11:28:00","modified_gmt":"2026-01-23T19:28:00","slug":"sound-transit-to-open-complete-2-line-in-march","status":"publish","type":"post","link":"https:\/\/www.heraldnet.com\/2026\/01\/23\/sound-transit-to-open-complete-2-line-in-march\/","title":{"rendered":"Sound Transit to open complete 2 Line in March"},"content":{"rendered":"<p>EVERETT &mdash; Sound Transit&rsquo;s long-awaited Link light rail connection across Lake Washington will open on March 28, the regional transit agency announced in a press release Friday.<\/p>\n<p>The opening of the 2 Line, first approved by voters in the 2008 Sound Transit 2 ballot measure, will complete a nonstop connection allowing travelers from Lynnwood to reach downtown Seattle, Bellevue and Redmond without making a transfer.<\/p>\n<p>Along with the new crosslake bridge, added service will also make trains arrive more frequently for travelers going between Lynnwood and downtown Seattle. As the existing 1 Line and 2 Line will both operate with eight-minute frequencies at peak hours, travelers taking the trains as far south as the International District can expect to see a train every four minutes.<\/p>\n<p>&ldquo;After decades of hard work, creative design, and world-class engineering, we are finally linking the east and west sides of Lake Washington with rail,&rdquo; Snohomish County Executive Dave Somers, also the chair of Sound Transit&rsquo;s Board of Directors, wrote in the press release. &ldquo;I applaud all those who worked on this project, and I appreciate the patience of the traveling public as the project worked through many barriers. Today is a very important milestone, and we look forward to Link light rail connecting Tacoma, Seattle, Everett, and Bellevue in the not-too-distant future.&rdquo;<\/p>\n<p>The Sound Transit 2 package is the same measure that funded the northbound <a href=\"https:\/\/www.heraldnet.com\/news\/lynnwood-light-rail-is-open-for-business\/\" target=\"_blank\">Link light rail expansion to <\/a><a href=\"https:\/\/www.heraldnet.com\/news\/lynnwood-light-rail-is-open-for-business\/\" target=\"_blank\">Lynnwood<\/a> that opened in 2024. But construction of the rail line across Lake Washington was marred by <a href=\"https:\/\/www.seattletimes.com\/seattle-news\/transportation\/why-sound-transit-is-late-to-cross-lake-washington\/\" target=\"_blank\">a number of <\/a><a href=\"https:\/\/www.seattletimes.com\/seattle-news\/transportation\/why-sound-transit-is-late-to-cross-lake-washington\/\" target=\"_blank\">delays<\/a> &mdash; caused primarly by <a href=\"https:\/\/www.seattletimes.com\/seattle-news\/transportation\/why-sound-transit-is-late-to-cross-lake-washington\/\" target=\"_blank\">the need to rebuild thousands of concrete rail ties<\/a>, according to The Seattle Times &mdash; pushing its expected 2023 opening date back by years.<\/p>\n<p>The 2 Line is the first light rail line in the world to operate on a floating bridge, in what was formerly I-90 express lanes. In the release, Sound Transit wrote that the project required &ldquo;innovative engineering to address the unique challenges of running electric trains across a moving body of water.&rdquo;<\/p>\n<p>The crosslake connection will also open two new stations: one in the east Seattle neighborhood of Judkins Park and another on Mercer Island. The total light rail network will increase from 55 miles in length to 63.<\/p>\n<p>Both the 1 Line and 2 Line will operate from approximately 5 a.m. to 1 a.m. Monday to Saturday, and from 6 a.m. to midnight on Sundays.<\/p>\n<p><a href=\"https:\/\/www.theurbanist.org\/2024\/04\/26\/2-line-launch\/\" target=\"_blank\">In 2024, because of delays<\/a> to the work on the floating bridge, Sound Transit opened a portion of the 2 Line on the Eastside, serving an area between South Bellevue and south Redmond. Stations serving as far north as downtown Redmond opened in 2025.<\/p>\n<p>Sound Transit expects to open additional light rail expansions to Everett in 2037, reaching the city core by 2041, funded by the voter-approved Sound Transit 3 ballot measure. The agency is<a href=\"https:\/\/www.heraldnet.com\/news\/sound-transit-weighs-possible-savings-on-everett-link-extension\/\" target=\"_blank\"> looking for major cost savings on its Sound Transit 3 <\/a><a href=\"https:\/\/www.heraldnet.com\/news\/sound-transit-weighs-possible-savings-on-everett-link-extension\/\" target=\"_blank\">projects<\/a>, which have grown in price since voters first approved them in 2016, largely due to inflation, tariffs and added right-of-way costs, among other reasons, according to the agency. The Everett Link extension is unlikely to see significant effects from those cost savings, however.<\/p>\n<p><em>Will Geschke: 425-339-3443; <\/em><a href=\"mailto:william.geschke@heraldnet.com\" target=\"_blank\"><em>william.geschke@heraldnet.com<\/em><\/a><em>; X: <\/em><a href=\"http:\/\/www.x.com\/willgeschke\" target=\"_blank\"><em>@willgeschke<\/em><\/a><em>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The light rail service connecting Lynnwood to Bellevue and beyond will also bring an increase in train frequency for travelers going to downtown Seattle. <\/p>\n","protected":false},"author":1126,"featured_media":861743,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[2,1024],"tags":[118],"class_list":["post-861742","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-top-news","tag-transportation"],"acf":[],"parsely":{"version":"1.1.0","canonical_url":"https:\/\/heraldnet.com\/2026\/01\/23\/sound-transit-to-open-complete-2-line-in-march\/","smart_links":{"inbound":0,"outbound":0},"traffic_boost_suggestions_count":0,"meta":{"@context":"https:\/\/schema.org","@type":"NewsArticle","headline":"Sound Transit to open complete 2 Line in March","url":"http:\/\/www.heraldnet.com\/2026\/01\/23\/sound-transit-to-open-complete-2-line-in-march\/","mainEntityOfPage":{"@type":"WebPage","@id":"http:\/\/www.heraldnet.com\/2026\/01\/23\/sound-transit-to-open-complete-2-line-in-march\/"},"thumbnailUrl":"https:\/\/www.heraldnet.com\/wp-content\/uploads\/sites\/8\/2026\/01\/41401907_web1_TSR-LightRailPreview-EDH-240828-fs.jpg?w=150&h=150&crop=1","image":{"@type":"ImageObject","url":"https:\/\/www.heraldnet.com\/wp-content\/uploads\/sites\/8\/2026\/01\/41401907_web1_TSR-LightRailPreview-EDH-240828-fs.jpg"},"articleSection":"Local News","author":[{"@type":"Person","name":"Will Geschke"}],"creator":["Will Geschke"],"publisher":{"@type":"Organization","name":"HeraldNet.com","logo":""},"keywords":["transportation"],"dateCreated":"2026-01-23T19:28:00Z","datePublished":"2026-01-23T19:28:00Z","dateModified":"2026-01-23T19:28:00Z"},"rendered":"<script type=\"application\/ld+json\" class=\"wp-parsely-metadata\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@type\":\"NewsArticle\",\"headline\":\"Sound Transit to open complete 2 Line in March\",\"url\":\"http:\\\/\\\/www.heraldnet.com\\\/2026\\\/01\\\/23\\\/sound-transit-to-open-complete-2-line-in-march\\\/\",\"mainEntityOfPage\":{\"@type\":\"WebPage\",\"@id\":\"http:\\\/\\\/www.heraldnet.com\\\/2026\\\/01\\\/23\\\/sound-transit-to-open-complete-2-line-in-march\\\/\"},\"thumbnailUrl\":\"https:\\\/\\\/www.heraldnet.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/01\\\/41401907_web1_TSR-LightRailPreview-EDH-240828-fs.jpg?w=150&h=150&crop=1\",\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/www.heraldnet.com\\\/wp-content\\\/uploads\\\/sites\\\/8\\\/2026\\\/01\\\/41401907_web1_TSR-LightRailPreview-EDH-240828-fs.jpg\"},\"articleSection\":\"Local News\",\"author\":[{\"@type\":\"Person\",\"name\":\"Will Geschke\"}],\"creator\":[\"Will Geschke\"],\"publisher\":{\"@type\":\"Organization\",\"name\":\"HeraldNet.com\",\"logo\":\"\"},\"keywords\":[\"transportation\"],\"dateCreated\":\"2026-01-23T19:28:00Z\",\"datePublished\":\"2026-01-23T19:28:00Z\",\"dateModified\":\"2026-01-23T19:28:00Z\"}<\/script>","tracker_url":"https:\/\/cdn.parsely.com\/keys\/heraldnet.com\/p.js"},"_links":{"self":[{"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/posts\/861742","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/users\/1126"}],"replies":[{"embeddable":true,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/comments?post=861742"}],"version-history":[{"count":0,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/posts\/861742\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/media\/861743"}],"wp:attachment":[{"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/media?parent=861742"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/categories?post=861742"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.heraldnet.com\/wp-json\/wp\/v2\/tags?post=861742"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}